8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights Light Poles for Outside Balcony Lights Patio Decor for String Lights ZP19081

8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights Light Poles for Outside Balcony Lights Patio Decor for String Lights ZP19081

$377.99
Sale price  $377.99 Regular price 
Skip to product information
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights Light Poles for Outside Balcony Lights Patio Decor for String Lights ZP19081

8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights Light Poles for Outside Balcony Lights Patio Decor for String Lights ZP19081

$377.99
Sale price  $377.99 Regular price 

- ONE LIGHT POST PER PURCHASE: You will receive one unassembled wood string light post with planter box per purchase - EASY TO ASSEMBLE: This wood string light pole assembles in approximately 60 minutes with only a power drill. You will receive materials for 1 pole for outdoor string lights. String lights are not included - FREESTANDING: No need to worry about messing with concrete or digging holes. This light post sits firmly in an aluminum reinforced FSC certified wood planter box - PLANTER BOX BASE: The planter box measures 22.5in H x 20in W x 20in L and the floorboard can be assembled at depths of 5" or 9.5". Before adding soil, we recommend filling the bottom chamber with at least 50lbs of small rocks or sandbags - DURABLE AND STURDY: Unlike flimsy aluminum light poles that bend and rust over time, our strong, FSC certified wood light post is reinforced by anodized posts around the planter box which provide additional stability. We recommend a distance of 144” (12ft) between light poles - BEAUTIFUL LIGHTING SOLUTION: Standing at over 8.5 ft tall, our string light pole with planter box for outside transforms any space into an oasis. Backyards, decks, patios, and gardens become the perfect setting for outdoor hanging lights - INCLUDED ACCESSORIES: We include an ornate decorative post cap and a powder coated aluminum hook to hang your string lights at any height along your wood post. String lights are not included.

Product description

Zippity Lifestyle Video

This is a modal window.

You may also like